top of page

Fiddler on the Roof

Props Head      Non-Equity National Broadway Tour
Joined Tour: February 6th, 2020       Tour Ended: March 15th, 2020

I joined this tour in February 2020 when the previous Props Head stepped down. The schedule for the remainder of the tour comprised of mostly week or split week sits, and was supposed to run through mid May. Like much of the entertainment industry, the tour was shut down mid March due to the spread of Covid-19 around the world. While this meant I was only with the show for a little over a month, in that time I worked on the show I was able to use my abilities and the support of my crew mates to smoothly run the props department.

Tour Basic Info:

  • S Contract, operating as an M

  • 5 Truck Show

  • 10 Hour Load In

  • 3 Hour Show Run

  • 5 Hour Load Out

Props Specific Tour Info:

  • 4 Prop Locals per venue

  • 10 person orchestra, including 2 keyboards and a medium drum kit

  • Very Large Props

My Basic Duties Included:

Load In

  • Facilitate unpack of all 4 to 5 trucks and make sure everything needed in each department reaches required location

  • Set up chairs/ stands/ keyboards/ drum kit in the pit

  • Unpack and assemble the Kitchen Unit, Well Unit, Bar Unit, 3 Trees, Tailor Counter, and 2 table/chair dollies

  • Set up Quick Change Alley

  • Preset larger prop pieces and furniture after the deck has been put down

  • Set up Hand Prop storage boxes for show

Show

  • Preset all props

  • Walk through SL and SR prop tracks with local props team

  • Run personal props track for show

  • Double check with props team throughout show

Load Out

  • Pack up 2 prop boxes, 1 work box, 2 storage boxes, 2 hampers

  • Disassemble and pack the Kitchen Unit, Well Unit, Bar Unit, Trees and Tree Box, Tailor Counter, and 2 table/chair dollies

  • Pack up the remainder of the drum kit and orchestra hampers (after smaller things are packed by pit rat)

  • Instruct pack of Truck 4 and Truck 3

20200314_130027_edited.jpg
20200213_081309_edited.jpg
20200307_232127_edited.png

The Sound of Music

Props Head      Non-Equity National Broadway Tour

Joined Tour: January 27, 2019       Tour Ended: June 2nd, 2019

I joined this tour in January when the previous Props Head stepped down. This was my first IATSE contract, joining the Union under the ACT contract. This was an S contract sized show, and I was a department of one on the tour. A very busy tour schedule. In the 4.5 months I was on the tour we preformed in 56 different cities, 35 of these cities we were in for just one night. The grueling hours were difficult but also allowed me to push myself and grow as a technician. This tour taught me to roll with the punches and make it work. Throughout the tour the crew was given countless curve balls, including small venues, difficult schedules, injured or ill crew members, and at least one flipped truck. Despite all of this, the crew would come together and make the show happen.

Tour Basic Info:

  • S Contract

  • 4 Truck Show

  • 8 Hour Load In

  • 3 Hour Show Run

  • 4 Hour Load Out

Props Specific Tour Info:

  • Marley Floor (4-6 sheets)

  • 4 Prop Locals per venue

  • 11 person orchestra, including 2 keyboards and a small drum kit

  • 1 Guitar used live on-stage

20190530_183614 (2).jpg

My Basic Duties Included:

Load In

  • Facilitate unpack of all 4 trucks and make sure everything needed in each department reaches required location

  • Set up chairs/ stands/ keyboards/ drum kit in the pit

  • Lay down Marley floor

  • Set up Quick Change Alley

  • Put together and preset larger prop pieces and furniture

  • Set up Hand Prop storage boxes for show

Show

  • Preset all props

  • Walk through SL and SR prop tracks with local props team

  • Run personal props track for show

  • Double check with props team throughout show

Load Out

  • Pack up 3 prop boxes, 1 work box, and various furniture for travel

  • Break down Quick Change Alley and pack up

  • Roll up Marley Floor

  • Line up Truck 4 and Truck 3 pack

  • Pack Truck 4 and Truck 3 (*only after Head Carpenter left tour, taught his replacement how to pack the trucks)

20190214_114958.jpg
20190519_233420_Moment.jpg
20190602_151244.jpg
20190130_183312.jpg
Emma Logo black version copy.png